Methodological proposal for the elaboration of a strategic plan for asset management in the electricity sector
Main Article Content
Abstract
Downloads
Article Details
DECLARATION OF ORGINIALITY OF SUBMITTED ARTICLE
With this document, I/We certify that the article submitted for possible publication in the institutional journal INGENIO MAGNO of the Research Center Alberto Magno CIIAM of the University Santo Tomás, Tunja campus, is entirely of my(our) own writing, and is a product of my(our) direct intellectual contribution to knowledge.
All data and references to completed publications are duly identified with their respective bibliographical entries and in the citations thus highlighted. If any adjustment or correction is needed, I(we) will contact the journal authorities in advance.
Due to that stated above, I(we) declare that the entirety of the submitted material is in accordance with applicable laws regarding intellectual and industrial property, and therefore, I(we) hold myself(ourselves) responsible for any complaint related to it.
If the submitted article is published, I(we) declare that I(we) fully relinquish publishing rights of the article to the University Santo Tomás, Tunja campus. As remuneration for this relinquishment of rights, I(we) declare my(our) agreement to receive two (2) copies of the edition of the journal in which my(our) article appears.
References
BONNEVILLE POWER ADMINISTRATION. (2012). Transmission Asset Management Strategy final -2012. Retrieved March 02, 2017, from. www.bpa.gov/Finance/AssetMgmt/Strategies/8.%20Transmission%20Asset%20Management%20Strategy%202012%20Executive%20Summary%20wAppendicies%20FINAL.pdf
COMMERCE COMISSION NEW ZELAND, (2011). Asset Management Maturity Assessment Tool (AMMAT) study. Retrieved March 02, 2017,
http://www.comcom.govt.nz/regulated-industries/gas-pipelines/gas-information-disclosure/gas-information-disclosure-consultation/asset-management-maturity-assessment-tool-ammat-study-2/
CORNELEC. (2015). Gestión estratégica de activos en las redes eléctricas. Retrieved April 14, 2017, from.
http://cornelec.cl/2015/10/23/gestion-estrategica-de-activos-en-las-redes-electricas/
International Copper Association Latin America (2015). Guía para la aplicación de la Norma ISO 55001. Santiago, Chile.
ISO. (2002). ISO 55000 Asset management — Overview, principles and terminology, 2002.
ISO. (2014). ISO 55001 Asset management - Management systems: Requirements, 1–20.
ISO. (2014). ISO 55002 Asset management – Guidelines for the application of ISO 55001
Kaizen Group Consulting. (2015). Evaluación de la Gestión de Activos. Retrieved April 14, 2017, from.
http://kaizen-group.com.ar/es/evaluación-de-la-gestión-de-activos
ORION. (2006). Asset Management Plan a 10 year management plan for Orion’s electricity network from 1 April 2006 to 31 March 2016, 2006. Retrieved March 15, 2017, from. http://www.oriongroup.co.nz/assets/Company/Corporate-publications/AMP-apr06-mar16.pdf
ORION. (2007). Asset Management Plan a 10 year management plan for Orion’s electricity network from 1 April 2007 to 31 March 2017. Retrieved March 15, 2017, from. http://www.oriongroup.co.nz/assets/Company/Corporate-publications/AMP-apr06-mar16.pdf
ORION. (2008). Asset Management Plan a 10 year management plan for Orion’s electricity network from 1 April 2009 to 31 March 2019. Retrieved March 15, 2017, from. http://www.oriongroup.co.nz/assets/Company/Corporate-publications/AMP-apr09-mar19.pdf
ORION. (2012). Asset Management Plan a 10 year management plan for Orion’s electricity network from 1 April 2012 to 31 March 2022, 2012. Retrieved March 15, 2017, from. http://www.oriongroup.co.nz/assets/Company/Corporate-publications/OrionAMP2012-20222.pdf
ORION. (2013). Asset Management Plan a 10 year management plan for Orion’s electricity network from 1 April 2013 to 31 March 2023, 2013. Retrieved March 15, 2017, from. http://www.oriongroup.co.nz/assets/Company/Corporate-publications/Orion-NZ-Ltd-AMP-2014.pdf
ORION. (2014). Asset Management Plan a 10 year management plan for Orion’s electricity network from 1 April 2014 to 31 March 2024, 2014. Retrieved March 15, 2017, from. http://www.oriongroup.co.nz/assets/Company/Corporate-publications/Orion-AMP2015-Complete.pdf
ORION. (2015). Asset Management Plan a 10 year management plan for Orion’s electricity network from 1 April 2015 to 31 March 2025, 2015. Retrieved March 15, 2017, from. http://www.oriongroup.co.nz/assets/Company/Corporate-publications/AMP-2015-2025.pdf
ORION. (2016). Asset Management Plan 2016. Retrieved March 15, 2017, from. http://www.oriongroup.co.nz/assets/Company/Corporate-publications/AMP-2015-2025.pdf
ORION. (2017). Asset Management Plan a 10 year management plan for Orion’s electricity network 1 April 2017 to 31 March 2027. Retrieved April 17, 2017, from. http://www.oriongroup.co.nz/assets/Company/Corporate-publications/AMP2018-2017-2027-ComCom-Complete-V2.pdf
POWERCO. (2007). Information disclosure asset management plan electricity networks 2007 – 2021. Retrieved March 11, 2017, from.
http://www.powerco.co.nz/uploaded_files/Publications-and-Disclosures/Statutory-Documents/Asset-Disclosures/AMP2006200790661523.pdf
POWERCO. (2008). Information disclosure asset management plan electricity networks fy2008 - fy2022. Retrieved March 11, 2017, from. http://www.powerco.co.nz/uploaded_files/Publications-and-Disclosures/Statutory-Documents/Asset-Disclosures/PowercoAMPFY2008.pdf
POWERCO. (2009). Asset Management Plan, 2009. Retrieved March 11, 2017, from. http://www.powerco.co.nz/uploaded_files/Publications-and-Disclosures/Statutory-Documents/Asset-Disclosures/PowercoAssetManagementPlan2010to2019webversion.pdf
POWERCO. (2010). Asset Management Plan 2010. Retrieved March 11, 2017, from. http://www.powerco.co.nz/uploaded_files/Publications-and-Disclosures/Statutory-Documents/Asset-Disclosures/AMP2010.pdf
POWERCO. (2011). Asset Management Plan 2011. Retrieved March 11, 2017, from. http://www.powerco.co.nz/uploaded_files/Publications-and-Disclosures/Statutory-Documents/Asset-Disclosures/AMP-2011.pdf
POWERCO. (2012). Asset Management Plan 2012. Retrieved March 11, 2017, from. http://www.powerco.co.nz/uploaded_files/Publications-and-Disclosures/Statutory-Documents/Asset-Disclosures/Powerco-AMP-2012.pdf
POWERCO. (2013). Asset Management Plan 2013. Retrieved March 11, 2017, from. http://www.powerco.co.nz/uploaded_files/Publications-and-Disclosures/New/Disclosures/AMP-2013.pdf
POWERCO. (2014). Asset Management Plan 2014. Retrieved March 11, 2017, from. http://www.powerco.co.nz/uploaded_files/Publications-and-Disclosures/New/Disclosures/Asset-Management-Plan-Update-2014.pdf
POWERCO. (2015). Asset Management Plan2015. Retrieved March 11, 2017, from. http://www.powerco.co.nz/uploaded_files/Publications-and-Disclosures/New/Disclosures/Electricity-Default-Price-Quality-Compliance-Statement-2015----Web-version.pdf
POWERCO. (2016). Asset Management Plan 2016. Retrieved March 11, 2017, from. http://www.powerco.co.nz/uploaded_files/Publications-and-Disclosures/New/Disclosures/POWERCO-AMP16-Interactive-PDF.pdf
POWERCO. (2017). Asset Management Plan 2017. Retrieved June 11, 2017, from. http://www.powerco.co.nz/uploaded_files/POWERCO%20Asset%20Management%20Plan%202017.pdf
TASNETWORK. (2015). AMP 2015-2020. Retrieved March 02, 2017, from. https://www.aer.gov.au/system/files/TasNetworks%20-%20TN025%20-%20Facilities%20Asset%20Management%20Plan%202015-2020%20-%20January%202016.pdf
TASNETWORK. (2015). Strategic Asset Management Plan. Retrieved March 02, 2017, from. https://www.aer.gov.au/system/files/TasNetworks%20-%20TN023%20-%20TasNetworks%20Strategic%20Asset%20Management%20Plan%202015%20-%20January%202016.pdf
The Institute of Asset Management. (June 2014). The Self-Assessment Methodology - Guidance.
TRANSGRID. (2012). State Highway Asset Management Plan 2012–2015. Retrieved March 15, 2017, from. http://www.nzta.govt.nz/assets/resources/state-highway-asset-management-plan/docs/state-highway-asset-mgmt-plan-2012-2015.pdf
TRANSPOWER. (2013). Asset Management Strategy. Retrieved March 02, 2017, from. https://www.transpower.co.nz/sites/default/files/uncontrolled_docs/Asset%20Management%20Strategy.pdf
TRANSPOWER. (2013). Lifecycle Strategy DELIVERY. Retrieved March 02, 2017, from. https://www.transpower.co.nz/sites/default/files/uncontrolled_docs/Delivery%20Lifecycle%20Strategy.pdf
TRANSPOWER. (2013). Lifecycle Strategy DISPOSAL AND DIVESTMENT. Retrieved March 02, 2017, from. https://www.transpower.co.nz/sites/default/files/uncontrolled_docs/Disposal%20and%20Divestments%20Lifecycle%20Strategy.pdf
TRANSPOWER. (2013).Lifecycle Strategy MAINTENANCE. Retrieved March 02, 2017, from. https://www.transpower.co.nz/sites/default/files/uncontrolled_docs/Maintenance%20Lifecycle%20Strategy.pdf
TRANSPOWER. . (2013). Lifecycle Strategy OPERATIONS. Retrieved March 02, 2017, from. https://www.transpower.co.nz/sites/default/files/uncontrolled_docs/Operations%20Lifecycle%20Strategy.pdf
TRANSPOWER. (2013), Lifecycle Strategy PLANNING. Retrieved March 02, 2017, from. https://www.transpower.co.nz/sites/default/files/uncontrolled_docs/Planning%20Lifecycle%20Strategy.pdf
UNISON. (2016). Plan Asset Management 2016. . Retrieved March 21, 2017, from. http://www.unison.co.nz/tell-me-about/unison-group/publications-disclosures/asset-management-plan
VECTOR. (1999). Asset Management Plan 1999/2000 and 2000/2001. Retrieved March 21, 2017, from. https://vectorwebstoreprd.blob.core.windows.net/blob/vector/media/vector-regulatory-disclosures/vector-electricity-amp-1999.pdf
VECTOR. (2013). Electricity Asset Management Plan 2013 – 2023. Retrieved March 21, 2017, from. https://www.vector.co.nz/documents/101943/102874/Vector+-+Electricity+AMP+-+2013.pdf/052b01a0-eb94-4a81-b5d9-7128082259a6
VECTOR. (2014). Electricity Asset Management Plan Update, 2014. Retrieved March 21, 2017, from. https://vectorwebstoreprd.blob.core.windows.net/blob/vector/media/vector-regulatory-disclosures/electricity-amp-update-2014-v2-0-approved-for-issue.pdf
VECTOR. (2015). Electricity Asset Management Plan Update, 2015. Retrieved March 21, 2017, from. https://vectorwebstoreprd.blob.core.windows.net/blob/vector/media/vector-regulatory-disclosures/electricity-amp-update-2015.pdf
VECTOR. (2016). Electricity Asset Management Plan 2016 – 2026. Retrieved March 21, 2017, from. https://vectorwebstoreprd.blob.core.windows.net/blob/vector/media/vector-regulatory-disclosures/electricity-asset-management-plan-2016-2026.pdf
VECTOR. (2017). Electricity Asset Management Plan Update. Retrieved April 17, 2017, from. https://vectorwebstoreprd.blob.core.windows.net/blob/vector/media/vector-regulatory-disclosures/final-electricity-amp-update-2017.pdf
WAIPA NETWORKS LIMITED. Asset Management Policy. Retrieved March 21, 2017, from. http://waipanetworks.co.nz/wp-content/uploads/2016/04/10_007547300_1457050909.pdf
WAIPA NETWORKS LIMITED. (2017). Asset Management Plan 1 April 2017 to 31 March 2027. Retrieved May 03, 2017, from. http://waipanetworks.co.nz/wp-content/uploads/2016/03/AMP-1-apr-2017-to-31-mar-2027-AMP2017_published.pdf
WAIPA NETWORKS LIMITED. (2016). Asset Management Plan 1 April 2016 to 31 March 2026. Retrieved March 21, 2017, from. http://waipanetworks.co.nz/wp-content/uploads/2016/04/10_068380400_1459379601.pdf
WAIPA NETWORKS LIMITED. (2013). Asset Management Plan 1 April 2013 to 31 March 2023. Retrieved March 21, 2017, from.
http://waipanetworks.co.nz/wp-content/uploads/2016/04/10_013082800_1364435970.pdf
WELLINGTON ELECTRICITY. (2016). 10 Year Asset Management Plan. Retrieved March 21, 2017, from. http://www.welectricity.co.nz/disclosures/2016-asset-management-plan
WELLINGTON ELECTRICITY. (2017). 10 Year Asset Management Plan. Retrieved April 17, 2017, from. https://welectricity.co.nz/disclosures/2017-asset-management-plan/
WELNETWORKS. (2007). Asset Management Plan 21 August 2007. Retrieved March 21, 2017, from. https://www.wel.co.nz/UserFiles/WelNetworks/File/Asset%20Management%20Plan%202007.pdf
WELNETWORKS. (2008). Asset Management Plan 18 Novenber 2008. Retrieved March 21, 2017, from. https://www.wel.co.nz/UserFiles/WelNetworks/File/AssetManagementPlanNovember2008.pdf
WELNETWORKS. (2009). Asset Management Plan 15 December 2009. Retrieved March 21, 2017, from. https://www.wel.co.nz/UserFiles/WelNetworks/File/AssetManagementPlan2009.pdf
WELNETWORKS. (2010). Asset Management Plan 14 December 2010. Retrieved March 21, 2017, from. https://www.wel.co.nz/UserFiles/WelNetworks/File/Asset%20Management%20Plan%202010.pdf
WELNETWORKS. (2011). Asset Management Plan 19 December 2011. Retrieved March 21, 2017, from. https://www.wel.co.nz/UserFiles/WelNetworks/File/Asset%20ManagementPlanDec%202011.PDF
WELNETWORKS. (2013). Asset Management Plan 2016. Retrieved March 21, 2017, from. https://www.wel.co.nz/UserFiles/WelNetworks/File/Final%20Asset%20Management%20Plan%2027%20March%202013.pdf
WELNETWORKS. (2014). Asset Management Plan 2016. Retrieved March 21, 2017, from. https://www.wel.co.nz/UserFiles/WelNetworks/File/2014%20AMP%20Update6(1).pdf
WELNETWORKS. (2015). Asset Management Plan 2016. Retrieved April 01, 2017, from. https://www.wel.co.nz/Publications/AssetManagementPlan/2015/files/assets/basic-html/page6.html
WELNETWORKS. (2016). Asset Management Plan 2016. Retrieved April 01, 2017, from. https://www.wel.co.nz/UserFiles/WelNetworks/File/2016%20WEL%20Networks%20Asset%20Management%20Plan%20(LR).pdf
WESTPOWER. (2003). Asset Management Plan 2003. Retrieved March 15, 2017, from. http://www.westpower.co.nz/system/files/resources/Create%20Resource/amp_2003.pdf
WESTPOWER. (2004). Asset Management Plan 2004. Retrieved March 15, 2017, from. http://www.westpower.co.nz/system/files/resources/amp_2004.pdf
WESTPOWER. (2005). Asset Management Plan 2005. Retrieved March 15, 2017, from. http://www.westpower.co.nz/system/files/resources/amp_2005.pdf
WESTPOWER. (2010). Asset Management Plan 2010 – 2019. Retrieved March 15, 2017, from. http://www.westpower.co.nz/system/files/resources/amp_2010_2019.pdf
WESTPOWER. (2011). Asset Management Plan 2011 – 2020. Retrieved March 15, 2017, from. http://www.westpower.co.nz/system/files/resources/amp_2011_2020.pdf
WESTPOWER. (2012). Asset Management Plan 2012 – 2021. Retrieved March 15, 2017, from. http://www.westpower.co.nz/system/files/resources/amp_2012_2021.pdf
WESTPOWER. (2013). Asset Management Plan 2013 – 2023. Retrieved March 15, 2017, from. http://www.westpower.co.nz/system/files/resources/amp_2013_2023.pdf
WESTPOWER. (2014). Asset Management Plan 2014 - 2024. Retrieved March 15, 2017, from. http://www.westpower.co.nz/system/files/resources/AssetManagementPlan2014_0.pdf
WESTPOWER. (2015). Asset Management Plan 2015 - 2025. Retrieved March 15, 2017, from. http://www.westpower.co.nz/system/files/resources/AMP_2015-2025_Web.pdf
WESTPOWER. (2016). Asset Management Plan 2016 – 2026. Retrieved March 15, 2017, from. http://www.westpower.co.nz/system/files/resources/AMP-2016-26_Web_V2.pdf